PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed junction boxes at the cmu walls Stair -3 Facing South.jpg Saw cutting the slab on grade at the Boiler-Electrical Room Facing North.jpg Installed roof drain protectors at the High Roof Facing South.jpg Installing electrical wire above the ceiling at the 4th floor Facing West.jpg Installing the Low Roof insulation Facing West.jpg Installing insulation along the parapet Facing South.jpg Installing the curtain wall mullions around the Monumental Stair radius Facing South.jpg Installing top metal track at the 4th floor Facing East.jpg
Previous pageNext page Installing the Low Roof insulation Facing West
Installing the Low Roof insulation Facing West